POD Hotel
This page shows facility, project, and distributed energy resource details. Click on the solid bars to show or hide details.
This page shows facility, project, and distributed energy resource details. Click on the solid bars to show or hide details.
Facility Details
View DataCategory | Lodging: Hotel |
---|---|
Electric Utility | Consolidated Edison |
Gas Utility | Consolidated Edison |
NYISO Zone | J - New York City |
-
Program CHP Developer/Installer RSP Systems Data Monitoring Oct 2020 – Dec 2023 NYSERDA Contract Name POD Hotel NYSERDA-funded Heat Recovery Loads Met Domestic Hot Water (DHW), Other Heat Loads Project Documentation
-
Unit Manufacturer Capstone Unit Model C65 Elec. Gen. Rating per Unit 65 kW Thermal Gen. Rating per Unit 388 MBtu/h No. of Units 2 No. of Prime Movers 2 Primary Fuel Natural Gas Prime Mover Microturbine Location Indoor - Above Ground Generator Inverter Rated Electric Efficiency (% HHV) 25.0 Rated CHP Efficiency (% HHV) 71.0
-