Twin Birch
This page shows facility, project, and distributed energy resource details. Click on the solid bars to show or hide details.
This page shows facility, project, and distributed energy resource details. Click on the solid bars to show or hide details.
Facility Details
View DataCategory | Agricultural: Dairy |
---|---|
Electric Utility | National Grid - Upstate NY (Niagara Mohawk) |
NYISO Zone | C - Central |
-
Program ADG Developer/Installer Ecolab (formerly AnAerobics Inc.) Data Monitoring Oct 2009 – Aug 2012 NYSERDA Contract Name Twin Birch - Phase 1 Grid Export Capable Project Documentation
-
Unit Manufacturer Capstone Turbine Corporation Unit Model C30 Elec. Gen. Rating per Unit 30 kW No. of Units 4 Primary Fuel Digester Gas Prime Mover Microturbine Generator Inverter Rated Electric Efficiency (% HHV) 27.0
-
-
Program ADG Developer/Installer Ecolab (formerly AnAerobics Inc.) Data Monitoring Oct 2009 – Aug 2012 NYSERDA Contract Name Twin Birch - Phase 2 Grid Export Capable Project Documentation
-
Unit Manufacturer Capstone Turbine Corporation Unit Model C30 Elec. Gen. Rating per Unit 90 kW No. of Units 2 Primary Fuel Digester Gas Prime Mover Microturbine Generator Inverter Rated Electric Efficiency (% HHV) 27.0
-
-
Program ADG Developer/Installer Ecolab (formerly AnAerobics Inc.) Data Monitoring Jul 2012 – Jun 2020 NYSERDA Contract Name Twin Birch - Phase 3 Heat Recovery Loads Met Other Heat Loads System Redundancy (N+1) Black-Start/Islanding Capable Grid Export Capable Project Documentation
-
Unit Manufacturer Guascor Unit Model SFGLD180 Elec. Gen. Rating 225 kW No. of Units 1 No. of Prime Movers 1 Primary Fuel Digester Gas Prime Mover Reciprocating Engine Location Indoor - Above Ground Generator Induction Generator Scrubber Type Biological Scrubber
-