Gateway One Building
This page shows facility, project, and distributed energy resource details. Click on the solid bars to show or hide details.
This page shows facility, project, and distributed energy resource details. Click on the solid bars to show or hide details.
Facility Details
View DataCategory | Office |
---|---|
Floor Area | 530000.0 |
Electric Utility | Consolidated Edison |
Gas Utility | Consolidated Edison |
NYISO Zone | I - Dunwoodie |
-
Program CHP Developer/Installer GI Energy (formerly Endurant Energy) Data Monitoring Sep 2015 – Mar 2020 NYSERDA Contract Name Gateway One Building Heat Recovery Loads Met Space Heating, Absorption Chiller System Redundancy (N+1) Grid Export Capable Project Documentation
-
Unit Manufacturer Caterpillar Unit Model G3520C Elec. Gen. Rating 2055 kW No. of Units 1 No. of Prime Movers 1 Primary Fuel Natural Gas Prime Mover Reciprocating Engine Location Indoor - Basement Generator Synchronous Generator Chiller Hot Water Driven, Exhaust-Fired
-