The facility monthly summary plot page shows electric generation from all DER projects in the facility, and utility import data if available. The sum of the DER generation and utility import data represents the total facility electric load.

To view data for different dates, select your desired date range and press “Go”.

To download data used to create the monthly summary plot in CSV format, press the download button to the top right of the chart.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

The facility monthly summary table shows electric generation from all DER projects in the facility, and utility import and facility electric load data if available.

To view data for different dates, select your desired date range and press “Go”.

To download data from the monthly summary table in CSV format, press the download button to the top right of the table.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Summary Table

Dec 2013 to Nov 2019
Electric Generation (kWh) Electric Utility Import (kWh) Facility Electric Load (kWh)
Total 5,720,875 5,720,875
Dec 2013
8,636 8,636
Jan 2014
26,492 26,492
Feb 2014
2,744 2,744
Mar 2014
62,223 62,223
Apr 2014
110,192 110,192
May 2014
127,479 127,479
Jun 2014
141,765 141,765
Jul 2014
137,787 137,787
Aug 2014
125,015 125,015
Sep 2014
99,050 99,050
Oct 2014
63,291 63,291
Nov 2014
39,001 39,001
Dec 2014
24,809 24,809
Jan 2015
28,235 28,235
Feb 2015
1,027 1,027
Mar 2015
38,976 38,976
Apr 2015
106,892 106,892
May 2015
141,361 141,361
Jun 2015
122,978 122,978
Jul 2015
146,644 146,644
Aug 2015
138,967 138,967
Sep 2015
101,906 101,906
Oct 2015
75,943 75,943
Nov 2015
45,132 45,132
Dec 2015
26,171 26,171
Jan 2016
40,521 40,521
Feb 2016
26,426 26,426
Mar 2016
94,062 94,062
Apr 2016
108,270 108,270
May 2016
117,595 117,595
Jun 2016
149,923 149,923
Jul 2016
130,023 130,023
Aug 2016
139,094 139,094
Sep 2016
100,671 100,671
Oct 2016
63,164 63,164
Nov 2016
46,522 46,522
Dec 2016
31,479 31,479
Jan 2017
27,921 27,921
Feb 2017
37,543 37,543
Mar 2017
48,247 48,247
Apr 2017
98,572 98,572
May 2017
108,717 108,717
Jun 2017
138,016 138,016
Jul 2017
135,464 135,464
Aug 2017
125,847 125,847
Sep 2017
99,180 99,180
Oct 2017
73,093 73,093
Nov 2017
44,121 44,121
Dec 2017
23,198 23,198
Jan 2018
29,821 29,821
Feb 2018
36,238 36,238
Mar 2018
57,137 57,137
Apr 2018
73,788 73,788
May 2018
93,198 93,198
Jun 2018
135,631 135,631
Jul 2018
152,367 152,367
Aug 2018
113,894 113,894
Sep 2018
70,015 70,015
Oct 2018
60,577 60,577
Nov 2018
31,012 31,012
Dec 2018
28,704 28,704
Jan 2019
28,578 28,578
Feb 2019
36,314 36,314
Mar 2019
48,247 48,247
Apr 2019
95,701 95,701
May 2019
110,591 110,591
Jun 2019
130,220 130,220
Jul 2019
142,925 142,925
Aug 2019
132,022 132,022
Sep 2019
98,170 98,170
Oct 2019
52,175 52,175
Nov 2019
13,165 13,165

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

The facility time series page shows electric generation from all DER projects in the facility. If available, utility import data is stacked on top to show total facility use. The sum of the DER generation and utility import data represents the total facility electric load.

To view data for another date range or time step, select your desired months and time step and press “Go”. Due to performance constraints, hourly data may only be displayed within a date range of up to one month in length.

To download data used to create the time series plot in CSV format, press the download button to the top right of the chart.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Times are shown in Eastern Time (ET) and are adjusted to reflect Daylight Saving Time (DST).