Skip to Main Content
Search distributed energy resources in New York

Target Clifton Park

Overview Target Clifton Park

The facility monthly summary plot page shows electric generation from all DER projects in the facility, and utility import data if available. The sum of the DER generation and utility import data represents the total facility electric load.

To view data for different dates, select your desired date range and press “Go”.

To download data used to create the monthly summary plot in CSV format, press the download button to the top right of the chart.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

The facility monthly summary table shows electric generation from all DER projects in the facility, and utility import and facility electric load data if available.

To view data for different dates, select your desired date range and press “Go”.

To download data from the monthly summary table in CSV format, press the download button to the top right of the table.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Summary Table

Nov 2015 to May 2024
Electric Generation (kWh) Electric Utility Import (kWh) Facility Electric Load (kWh)
Total 3,957,558 3,957,558
Nov 2015
15,534 15,534
Dec 2015
16,919 16,919
Jan 2016
22,629 22,629
Feb 2016
23,817 23,817
Mar 2016
57,410 57,410
Apr 2016
49,159 49,159
May 2016
55,902 55,902
Jun 2016
70,090 70,090
Jul 2016
67,115 67,115
Aug 2016
62,954 62,954
Sep 2016
52,341 52,341
Oct 2016
34,385 34,385
Nov 2016
22,271 22,271
Dec 2016
13,102 13,102
Jan 2017
16,578 16,578
Feb 2017
20,057 20,057
Mar 2017
36,149 36,149
Apr 2017
50,606 50,606
May 2017
53,702 53,702
Jun 2017
62,567 62,567
Jul 2017
61,067 61,067
Aug 2017
60,422 60,422
Sep 2017
53,469 53,469
Oct 2017
39,562 39,562
Nov 2017
23,379 23,379
Dec 2017
8,236 8,236
Jan 2018
12,468 12,468
Feb 2018
17,528 17,528
Mar 2018
16,555 16,555
Apr 2018
45,549 45,549
May 2018
63,026 63,026
Jun 2018
65,496 65,496
Jul 2018
72,598 72,598
Aug 2018
56,409 56,409
Sep 2018
42,520 42,520
Oct 2018
15,481 15,481
Nov 2018
12,064 12,064
Dec 2018
17,819 17,819
Jan 2019
17,487 17,487
Feb 2019
19,263 19,263
Mar 2019
46,759 46,759
Apr 2019
49,474 49,474
May 2019
53,512 53,512
Jun 2019
62,570 62,570
Jul 2019
68,520 68,520
Aug 2019
62,989 62,989
Sep 2019
50,991 50,991
Oct 2019
30,906 30,906
Nov 2019
19,396 19,396
Dec 2019
8,493 8,493
Jan 2020
15,467 15,467
Feb 2020
13,049 13,049
Mar 2020
42,492 42,492
Apr 2020
48,207 48,207
May 2020
68,118 68,118
Jun 2020
64,609 64,609
Jul 2020
66,020 66,020
Aug 2020
59,619 59,619
Sep 2020
48,970 48,970
Oct 2020
32,255 32,255
Nov 2020
21,015 21,015
Dec 2020
8,662 8,662
Jan 2021
8,974 8,974
Feb 2021
4,985 4,985
Mar 2021
45,133 45,133
Apr 2021
33,448 33,448
May 2021
60,237 60,237
Jun 2021
60,660 60,660
Jul 2021
54,650 54,650
Aug 2021
53,821 53,821
Sep 2021
44,660 44,660
Oct 2021
30,099 30,099
Nov 2021
24,394 24,394
Dec 2021
13,973 13,973
Jan 2022
6,485 6,485
Feb 2022
19,472 19,472
Mar 2022
38,837 38,837
Apr 2022
51,884 51,884
May 2022
65,959 65,959
Jun 2022
65,403 65,403
Jul 2022
67,320 67,320
Aug 2022
54,723 54,723
Sep 2022
39,869 39,869
Oct 2022
35,105 35,105
Nov 2022
23,703 23,703
Dec 2022
9,978 9,978
Jan 2023
7,947 7,947
Feb 2023
14,635 14,635
Mar 2023
27,238 27,238
Apr 2023
51,324 51,324
May 2023
71,664 71,664
Jun 2023
54,931 54,931
Jul 2023
58,458 58,458
Aug 2023
50,642 50,642
Sep 2023
43,186 43,186
Oct 2023
30,441 30,441
Nov 2023
22,075 22,075
Dec 2023
13,742 13,742
Jan 2024
8,039 8,039
Feb 2024
34,940 34,940
Mar 2024
34,582 34,582
Apr 2024
46,914 46,914
May 2024
7,255 7,255

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

The facility time series page shows electric generation from all DER projects in the facility. If available, utility import data is stacked on top to show total facility use. The sum of the DER generation and utility import data represents the total facility electric load.

To view data for another date range or time step, select your desired months and time step and press “Go”. Due to performance constraints, hourly data may only be displayed within a date range of up to one month in length.

To download data used to create the time series plot in CSV format, press the download button to the top right of the chart.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Times are shown in Eastern Time (ET) and are adjusted to reflect Daylight Saving Time (DST).

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.