Overview Target Liverpool

The facility monthly summary plot page shows electric generation from all DER projects in the facility, and utility import data if available. The sum of the DER generation and utility import data represents the total facility electric load.

To view data for different dates, select your desired date range and press “Go”.

To download data used to create the monthly summary plot in CSV format, press the download button to the top right of the chart.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

The facility monthly summary table shows electric generation from all DER projects in the facility, and utility import and facility electric load data if available.

To view data for different dates, select your desired date range and press “Go”.

To download data from the monthly summary table in CSV format, press the download button to the top right of the table.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Summary Table

Feb 2016 to May 2024
Electric Generation (kWh) Electric Utility Import (kWh) Facility Electric Load (kWh)
Total 3,021,164 3,021,164
Feb 2016
425 425
Mar 2016
27,509 27,509
Apr 2016
47,642 47,642
May 2016
60,308 60,308
Jun 2016
68,576 68,576
Jul 2016
66,018 66,018
Aug 2016
60,112 60,112
Sep 2016
55,319 55,319
Oct 2016
30,431 30,431
Nov 2016
20,474 20,474
Dec 2016
4,440 4,440
Jan 2017
11,723 11,723
Feb 2017
13,773 13,773
Mar 2017
32,196 32,196
Apr 2017
49,605 49,605
May 2017
46 46
Jun 2017
5,365 5,365
Jul 2017
58,309 58,309
Aug 2017
< 1 < 1
Sep 2017
32,197 32,197
Oct 2017
38,557 38,557
Nov 2017
19,199 19,199
Dec 2017
8,208 8,208
Jan 2018
6,569 6,569
Feb 2018
12,825 12,825
Mar 2018
14,064 14,064
Apr 2018
42,857 42,857
May 2018
68,629 68,629
Jun 2018
67,958 67,958
Jul 2018
74,041 74,041
Aug 2018
55,764 55,764
Sep 2018
48,634 48,634
Oct 2018
26,929 26,929
Nov 2018
7,260 7,260
Dec 2018
3,459 3,459
Jan 2019
9,076 9,076
Feb 2019
12,969 12,969
Mar 2019
28,887 28,887
Apr 2019
42,944 42,944
May 2019
49,986 49,986
Jun 2019
60,541 60,541
Jul 2019
64,467 64,467
Aug 2019
58,998 58,998
Sep 2019
47,363 47,363
Oct 2019
28,188 28,188
Nov 2019
12,460 12,460
Dec 2019
6,781 6,781
Jan 2020
5,000 5,000
Feb 2020
5,214 5,214
Mar 2020
37,204 37,204
Apr 2020
48,642 48,642
May 2020
66,236 66,236
Jun 2020
74,510 74,510
Jul 2020
73,708 73,708
Aug 2020
66,121 66,121
Sep 2020
51,044 51,044
Oct 2020
30,181 30,181
Nov 2020
19,500 19,500
Dec 2020
6,897 6,897
Jan 2021
3,739 3,739
Feb 2021
1,469 1,469
Mar 2021
49,145 49,145
Apr 2021
52,876 52,876
May 2021
67,861 67,861
Jun 2021
68,361 68,361
Jul 2021
51,982 51,982
Aug 2021
0 0
Sep 2021
0 0
Oct 2021
0 0
Nov 2021
0 0
Dec 2021
0 0
Jan 2022
0 0
Feb 2022
0 0
Mar 2022
15,857 15,857
Apr 2022
46,137 46,137
May 2022
15,500 15,500
Jun 2022
0 0
Jul 2022
0 0
Aug 2022
0 0
Sep 2022
18,311 18,311
Oct 2022
35,310 35,310
Nov 2022
19,669 19,669
Dec 2022
7,277 7,277
Jan 2023
4,420 4,420
Feb 2023
14,246 14,246
Mar 2023
19,456 19,456
Apr 2023
50,525 50,525
May 2023
69,319 69,319
Jun 2023
55,255 55,255
Jul 2023
58,072 58,072
Aug 2023
51,835 51,835
Sep 2023
44,779 44,779
Oct 2023
24,779 24,779
Nov 2023
15,324 15,324
Dec 2023
7,894 7,894
Jan 2024
6,366 6,366
Feb 2024
21,472 21,472
Mar 2024
32,398 32,398
Apr 2024
41,197 41,197
May 2024
3,995 3,995

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

The facility time series page shows electric generation from all DER projects in the facility. If available, utility import data is stacked on top to show total facility use. The sum of the DER generation and utility import data represents the total facility electric load.

To view data for another date range or time step, select your desired months and time step and press “Go”. Due to performance constraints, hourly data may only be displayed within a date range of up to one month in length.

To download data used to create the time series plot in CSV format, press the download button to the top right of the chart.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Times are shown in Eastern Time (ET) and are adjusted to reflect Daylight Saving Time (DST).

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.