Skip to Main Content
Search distributed energy resources in New York

Orange County DPW

Overview Orange County DPW

The facility monthly summary plot page shows electric generation from all DER projects in the facility, and utility import data if available. The sum of the DER generation and utility import data represents the total facility electric load.

To view data for different dates, select your desired date range and press “Go”.

To download data used to create the monthly summary plot in CSV format, press the download button to the top right of the chart.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

The facility monthly summary table shows electric generation from all DER projects in the facility, and utility import and facility electric load data if available.

To view data for different dates, select your desired date range and press “Go”.

To download data from the monthly summary table in CSV format, press the download button to the top right of the table.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Summary Table

May 2017 to May 2024
Electric Generation (kWh) Electric Utility Import (kWh) Facility Electric Load (kWh)
Total 14,206,724 14,206,724
May 2017
82,591 82,591
Jun 2017
115,008 115,008
Jul 2017
0 0
Aug 2017
185,737 185,737
Sep 2017
227,408 227,408
Oct 2017
174,213 174,213
Nov 2017
75,488 75,488
Dec 2017
67,888 67,888
Jan 2018
98,954 98,954
Feb 2018
65,526 65,526
Mar 2018
186,317 186,317
Apr 2018
111,566 111,566
May 2018
167,232 167,232
Jun 2018
31,712 31,712
Jul 2018
298,974 298,974
Aug 2018
232,273 232,273
Sep 2018
159,272 159,272
Oct 2018
156,505 156,505
Nov 2018
97,909 97,909
Dec 2018
92,069 92,069
Jan 2019
94,552 94,552
Feb 2019
153,439 153,439
Mar 2019
190,938 190,938
Apr 2019
215,697 215,697
May 2019
212,450 212,450
Jun 2019
225,935 225,935
Jul 2019
250,983 250,983
Aug 2019
268,395 268,395
Sep 2019
230,101 230,101
Oct 2019
128,609 128,609
Nov 2019
62,057 62,057
Dec 2019
53,180 53,180
Jan 2020
96,441 96,441
Feb 2020
119,344 119,344
Mar 2020
148,124 148,124
Apr 2020
133,097 133,097
May 2020
234,224 234,224
Jun 2020
119,558 119,558
Jul 2020
150,322 150,322
Aug 2020
278,509 278,509
Sep 2020
117,587 117,587
Oct 2020
84,371 84,371
Nov 2020
141,210 141,210
Dec 2020
76,007 76,007
Jan 2021
100,837 100,837
Feb 2021
77,001 77,001
Mar 2021
269,059 269,059
Apr 2021
256,252 256,252
May 2021
283,875 283,875
Jun 2021
282,709 282,709
Jul 2021
253,610 253,610
Aug 2021
239,187 239,187
Sep 2021
228,338 228,338
Oct 2021
157,922 157,922
Nov 2021
144,877 144,877
Dec 2021
89,541 89,541
Jan 2022
109,129 109,129
Feb 2022
148,960 148,960
Mar 2022
187,117 187,117
Apr 2022
253,416 253,416
May 2022
254,413 254,413
Jun 2022
274,288 274,288
Jul 2022
299,723 299,723
Aug 2022
271,634 271,634
Sep 2022
220,559 220,559
Oct 2022
181,973 181,973
Nov 2022
137,075 137,075
Dec 2022
89,793 89,793
Jan 2023
77,164 77,164
Feb 2023
143,363 143,363
Mar 2023
195,942 195,942
Apr 2023
236,890 236,890
May 2023
313,786 313,786
Jun 2023
236,929 236,929
Jul 2023
270,090 270,090
Aug 2023
241,291 241,291
Sep 2023
200,487 200,487
Oct 2023
170,894 170,894
Nov 2023
147,212 147,212
Dec 2023
77,426 77,426
Jan 2024
64,645 64,645
Feb 2024
162,748 162,748
Mar 2024
211,462 211,462
Apr 2024
198,196 198,196
May 2024
35,141 35,141

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.

The facility time series page shows electric generation from all DER projects in the facility. If available, utility import data is stacked on top to show total facility use. The sum of the DER generation and utility import data represents the total facility electric load.

To view data for another date range or time step, select your desired months and time step and press “Go”. Due to performance constraints, hourly data may only be displayed within a date range of up to one month in length.

To download data used to create the time series plot in CSV format, press the download button to the top right of the chart.

Automated data filtering can be enabled or disabled via the control. Filtered data automatically checks to determine if the energy streams measured are consistent with each other (e.g. fuel consumption or heat recovery are reported only when a DER is reporting generated power). Disabling this control shows all data available.

Times are shown in Eastern Time (ET) and are adjusted to reflect Daylight Saving Time (DST).

Production data is not in real time and may be delayed as data is periodically reported and uploaded to this website.