Birchwood Towers - The Kyoto
This page shows facility, project, and distributed energy resource details. Click on the solid bars to show or hide details.
This page shows facility, project, and distributed energy resource details. Click on the solid bars to show or hide details.
Facility Details
View DataCategory | Residential: Multifamily |
---|---|
Electric Utility | Consolidated Edison |
Gas Utility | National Grid - NYC (Brooklyn Union) |
NYISO Zone | J - New York City |
-
Program CHP Developer/Installer Aegis Energy Services, Inc. Data Monitoring Mar 2015 – Mar 2023 NYSERDA Contract Name Kyoto Building ConEd Target Zone Heat Recovery Loads Met Domestic Hot Water (DHW), Space Heating System Redundancy (N+1) Black-Start/Islanding Capable Grid Export Capable Project Documentation
-
Unit Manufacturer Aegis Energy Services, Inc. Unit Model Aegen TP-75LE Elec. Gen. Rating 75 kW Thermal Gen. Rating 523 MBtu/h No. of Units 1 No. of Prime Movers 1 Primary Fuel Natural Gas Prime Mover Reciprocating Engine Location Indoor - Basement Generator Inverter Rated Electric Efficiency (% HHV) 26.9 Rated CHP Efficiency (% HHV) 82.1
-